Skip to content
Hugin
A tall steel-framed hourglass on a bare concrete ledge, most of its pale sand already run into the lower bulb, in cold light.
  1. 8 days

    Amazon Web Services · Retirement

    Five older Claude model families in the Regions specified in Amazon Bedrock's lifecycle table reach their scheduled end of life

    Check your exact model ID and AWS Region against the operative table. Amazon says migration does not happen automatically; plan a transition to an Active model before the listed EOL date.

    Nothing to move to. The captured legacy table has no replacement column and names no successor for these rows. This does not establish that no alternative exists.

    Sources and checks

    Read October 22, 2026. Region-scoped rows, not worldwide vendor retirements. The page's general prose promises at least six months in Legacy and at least three months before extended access, but these rows list October 10/13/15 Legacy starts, same-day extended access and November 13 EOL. That source inconsistency is unresolved; the table dates are reported, not reconciled. Amazon says requests fail on or soon after EOL unless privately arranged. No authenticated endpoint was called. The exact table rows below retain the date, model IDs and Region scope; continuation rows inherit the model named immediately before them. Anthropic Claude 3 Haiku anthropic.claude-3-haiku-20240307-v1:0 ap-northeast-2, ap-south-1, ap-southeast-1 October 10, 2026 November 13, 2026 October 10, 2026 | eu-central-2, sa-east-1 October 13, 2026 November 13, 2026 October 13, 2026 | ca-central-1 October 15, 2026 November 13, 2026 October 15, 2026 | Anthropic Claude 3 Sonnet anthropic.claude-3-sonnet-20240229-v1:0 ap-south-1, ap-southeast-1, eu-west-2 October 10, 2026 November 13, 2026 October 10, 2026 | sa-east-1 October 13, 2026 November 13, 2026 October 13, 2026 | ca-central-1 October 15, 2026 November 13, 2026 October 15, 2026 | Anthropic Claude 3.5 Sonnet anthropic.claude-3-5-sonnet-20240620-v1:0 ap-northeast-2, ap-south-1, ap-southeast-1 October 10, 2026 November 13, 2026 October 10, 2026 | Anthropic Claude 3.5 Sonnet v2 anthropic.claude-3-5-sonnet-20241022-v2:0 ap-northeast-2, ap-south-1, ap-southeast-1 October 10, 2026 November 13, 2026 October 10, 2026 | Anthropic Claude 3.7 Sonnet anthropic.claude-3-7-sonnet-20250219-v1:0 ap-south-1, eu-west-2 October 10, 2026 November 13, 2026 October 10, 2026

    Operative page re-read: Read, and it still says what this row says: 28 recorded terms present.

  2. 124 days

    Amazon Web Services · Retirement

    Writer Palmyra X4 reaches scheduled end of life in its listed Bedrock Regions

    Check your exact model ID and AWS Region against the operative table. Amazon says migration does not happen automatically; plan a transition to an Active model before the listed EOL date.

    Nothing to move to. The captured legacy table has no replacement column and names no successor for these rows. This does not establish that no alternative exists.

    Sources and checks

    Read October 22, 2026. Region-scoped rows, not worldwide vendor retirements. Amazon says requests fail on or soon after EOL unless privately arranged. No authenticated endpoint was called. The exact table rows below retain the date, model IDs and Region scope; continuation rows inherit the model named immediately before them. Writer Palmyra X4 writer.palmyra-x4-v1:0 us-east-1, us-east-2, us-west-1, us-west-2 September 9, 2026 March 9, 2027 —

    Operative page re-read: Read, and it still says what this row says: 28 recorded terms present.

  3. 136 days

    Amazon Web Services · Retirement

    Writer Palmyra X5 reaches scheduled end of life in its listed Bedrock Regions

    Check your exact model ID and AWS Region against the operative table. Amazon says migration does not happen automatically; plan a transition to an Active model before the listed EOL date.

    Nothing to move to. The captured legacy table has no replacement column and names no successor for these rows. This does not establish that no alternative exists.

    Sources and checks

    Read October 22, 2026. Region-scoped rows, not worldwide vendor retirements. Amazon says requests fail on or soon after EOL unless privately arranged. No authenticated endpoint was called. The exact table rows below retain the date, model IDs and Region scope; continuation rows inherit the model named immediately before them. Writer Palmyra X5 writer.palmyra-x5-v1:0 us-east-1, us-east-2, us-west-1, us-west-2 September 21, 2026 March 21, 2027 —

    Operative page re-read: Read, and it still says what this row says: 28 recorded terms present.

  4. 137 days

    Amazon Web Services · Retirement

    TwelveLabs Marengo Embed 3.0 and Pegasus v1.2 reach scheduled end of life in their listed Bedrock Regions

    Check your exact model ID and AWS Region against the operative table. Amazon says migration does not happen automatically; plan a transition to an Active model before the listed EOL date.

    Nothing to move to. The captured legacy table has no replacement column and names no successor for these rows. This does not establish that no alternative exists.

    Sources and checks

    Read October 22, 2026. Region-scoped rows, not worldwide vendor retirements. Amazon says requests fail on or soon after EOL unless privately arranged. No authenticated endpoint was called. The exact table rows below retain the date, model IDs and Region scope; continuation rows inherit the model named immediately before them. TwelveLabs Marengo Embed 3.0 twelvelabs.marengo-embed-3-0-v1:0 ap-northeast-2 September 22, 2026 March 22, 2027 — | TwelveLabs Pegasus v1.2 twelvelabs.pegasus-1-2-v1:0 af-south-1, ap-east-2, ap-northeast-1, ap-northeast-2, ap-northeast-3, ap-south-1, ap-south-2, ap-southeast-1, ap-southeast-2, ap-southeast-3, ap-southeast-4, ap-southeast-5, ap-southeast-7, ca-central-1, ca-west-1, eu-central-1, eu-central-2, eu-north-1, eu-south-1, eu-south-2, eu-west-1, eu-west-2, eu-west-3, il-central-1, mx-central-1, sa-east-1, us-east-1, us-east-2, us-west-1, us-west-2 September 22, 2026 March 22, 2027 —

    Operative page re-read: Read, and it still says what this row says: 28 recorded terms present.

  5. 145 days

    Amazon Web Services · Retirement

    The September 30 legacy cohort of third-party Bedrock model IDs reaches scheduled end of life in each row's listed Regions

    Check your exact model ID and AWS Region against the operative table. Amazon says migration does not happen automatically; plan a transition to an Active model before the listed EOL date.

    Nothing to move to. The captured legacy table has no replacement column and names no successor for these rows. This does not establish that no alternative exists.

    Sources and checks

    Read October 22, 2026. Region-scoped rows, not worldwide vendor retirements. Amazon says requests fail on or soon after EOL unless privately arranged. No authenticated endpoint was called. The exact table rows below retain the date, model IDs and Region scope; continuation rows inherit the model named immediately before them. DeepSeek DeepSeek-R1 deepseek.r1-v1:0 us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | DeepSeek DeepSeek-V3.1 deepseek.v3-v1:0 (bedrock-runtime), deepseek.v3.1 (bedrock-mantle) ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-north-1, eu-west-2, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Google Gemma 3 12B IT google.gemma-3-12b-it ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Google Gemma 3 27B PT google.gemma-3-27b-it ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Google Gemma 3 4B IT google.gemma-3-4b-it ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 3 70B Instruct meta.llama3-70b-instruct-v1:0 ap-south-1, ca-central-1, eu-west-2, us-east-1, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 3 8B Instruct meta.llama3-8b-instruct-v1:0 ap-south-1, ca-central-1, eu-west-2, us-east-1, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 3.1 70B Instruct meta.llama3-1-70b-instruct-v1:0 us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 3.1 8B Instruct meta.llama3-1-8b-instruct-v1:0 us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 3.3 70B Instruct meta.llama3-3-70b-instruct-v1:0 us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 4 Maverick 17B Instruct meta.llama4-maverick-17b-instruct-v1:0 us-east-1, us-east-2, us-west-1, us-west-2 September 30, 2026 March 30, 2027 To be announced | Meta Llama 4 Scout 17B Instruct meta.llama4-scout-17b-instruct-v1:0 us-east-1, us-east-2, us-west-1, us-west-2 September 30, 2026 March 30, 2027 To be announced | MiniMax MiniMax M2 minimax.minimax-m2 ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | MiniMax MiniMax M2.1 minimax.minimax-m2.1 ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-central-1, eu-north-1, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Mistral AI Devstral 2 123B mistral.devstral-2-123b ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-central-1, eu-north-1, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Mistral AI Mistral 7B Instruct mistral.mistral-7b-instruct-v0:2 ap-south-1, ap-southeast-2, ca-central-1, eu-west-1, eu-west-2, eu-west-3, sa-east-1, us-east-1, us-west-2 September 30, 2026 March 30, 2027 To be announced | Mistral AI Mixtral 8x7B Instruct mistral.mixtral-8x7b-instruct-v0:1 ap-south-1, ap-southeast-2, ca-central-1, eu-west-1, eu-west-2, eu-west-3, sa-east-1, us-east-1, us-west-2 September 30, 2026 March 30, 2027 To be announced | Mistral AI Voxtral Mini 3B 2507 mistral.voxtral-mini-3b-2507 ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Mistral AI Voxtral Small 24B 2507 mistral.voxtral-small-24b-2507 ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Moonshot AI Kimi K2 Thinking moonshot.kimi-k2-thinking (bedrock-runtime), moonshotai.kimi-k2-thinking (bedrock-mantle) ap-northeast-1, ap-south-1, ap-southeast-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | NVIDIA NVIDIA Nemotron Nano 12B v2 VL BF16 nvidia.nemotron-nano-12b-v2 ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | NVIDIA NVIDIA Nemotron Nano 9B v2 nvidia.nemotron-nano-9b-v2 ap-northeast-1, ap-south-1, ap-southeast-2, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Qwen Qwen3-Coder-30B-A3B-Instruct qwen.qwen3-coder-30b-a3b-v1:0 (bedrock-runtime), qwen.qwen3-coder-30b-a3b-instruct (bedrock-mantle) ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-central-1, eu-north-1, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Qwen Qwen3 Coder 480B A35B Instruct qwen.qwen3-coder-480b-a35b-v1:0 (bedrock-runtime), qwen.qwen3-coder-480b-a35b-instruct (bedrock-mantle) ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-north-1, eu-west-2, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Z.AI GLM 4.7 zai.glm-4.7 ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-north-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced | Z.AI GLM 4.7 Flash zai.glm-4.7-flash ap-northeast-1, ap-south-1, ap-southeast-2, ap-southeast-3, eu-central-1, eu-north-1, eu-south-1, eu-west-1, eu-west-2, sa-east-1, us-east-1, us-east-2, us-west-2 September 30, 2026 March 30, 2027 To be announced

    Operative page re-read: Read, and it still says what this row says: 28 recorded terms present.

Only dates a provider has published — nothing inferred, nothing from rumour. Every row is backed by a source anchor in the case files, and shows what this desk’s own re-read of the provider’s page last found.

The government board below it is a separate list with a separate rule: a duty a government body published in its own document, cited to the Federal Register document number and the sentence it rests on. Those dates are not in the calendar feed or the provider API yet.

Subscribe by calendar (when a date moves, the event moves) · Data · The case file · Corrections